
11/24/2026
Reading Monthly Record Summaries
See how monthly summaries group records and how their date basis explains entries that cross from one calendar month into another.
Read guideSee how recurring entries land in different months when their scheduled dates and recorded dates straddle a calendar boundary. Learn to compare period totals without mixing the two date bases.

A recurring schedule can continue unchanged while an individual entry appears in a different month depending on the date basis used by the summary.
A scheduled date identifies when an entry is expected; its recorded date determines membership in a recorded-date summary.
An entry scheduled on August 31 and recorded on September 1 belongs to August by schedule and September by recorded date.
Use one stated date basis for a period total so a cross-month entry is not counted in both months of the same summary.
A scheduled occurrence describes a plan; it does not prove that the entry was recorded or that a payment took place.
The examples show how the same recurring schedule can place entries in different periods. Inclusion below is assessed by recorded date unless the scheduled-date basis is named.
These rows contain no monetary totals. A September total based on recorded dates includes the utility, insurance, and rent entries; a September total based on scheduled dates includes the utility and subscription entries instead.
Recurring entries follow a schedule, but their period membership depends on the date a summary uses. Keep the scheduled date and recorded date separate: that simple distinction makes month-to-month comparisons easier to check and prevents an expected occurrence from being mistaken for a recorded one.
Suppose a fictional monthly rent entry is scheduled for August 31 and recorded on September 1. A scheduled-date summary places it in August; a recorded-date summary places it in September. A fictional subscription scheduled for September 30 but recorded on October 2 moves in the opposite direction. The recurrence remains monthly in both examples, while the period containing each record changes with the chosen date basis.
To compare periods fairly, choose the basis first and apply it to every entry in the comparison. A September recorded-date total includes records dated September 1 through September 30, including the rent and insurance entries in the table. It excludes the subscription recorded October 2. A September scheduled-date total instead uses scheduled dates in that range; it includes the subscription and excludes the rent entry scheduled August 31. Neither total establishes whether a payment occurred.
The rent entry is scheduled outside September; its September 1 recorded date places it inside a recorded-date September summary.
Both endpoints belong to September. Entries recorded within this range are included in a September recorded-date summary.
The subscription recorded October 2 falls outside September by recorded date, even though it was scheduled for September 30.
A short review before comparing monthly summaries can reveal why a recurring entry appears to shift. Keep the same date basis across every month in the comparison, then inspect boundary entries individually rather than changing their dates to make totals appear aligned.
Label the comparison as scheduled-date or recorded-date before calculating any period total.
Review entries scheduled or recorded on the final day of a month and the first day of the next month.
Explain a difference by naming the entry and both dates; do not count it in two periods under the same date basis.
Treat the scheduled date as an expectation and the recorded date as the date assigned to the entry in a recorded-date view.
This method makes recurring activity easier to follow across month-end without altering the underlying schedule. For a hands-on fictional sequence, continue with the Record Timeline Workbook; for interpreting totals by period, see Reading Monthly Record Summaries.
These answers clarify how schedule dates and record dates affect period membership.
A recorded-date summary places an entry recorded on September 1 in September, even when its scheduled date was August 31.
Under one consistent date basis, an individual entry belongs to the interval containing that basis date. Do not count the same entry in two months of the same comparison.
No. A scheduled date describes when an entry is expected. It does not, by itself, confirm that the entry was recorded or that payment occurred.
Follow a fictional sequence of records in the timeline workshop.